Cumulative area discounts flow through structures and network before

The cumulative area calculation discounts everything before a flow through structure and the nodes attached to the structure. LLFA's are now requesting calc files due to the print out also reading your incorrect pathing of calculations. Theirs no ...
Guest 30 days ago in  0 👷🏽‍♀️Promoted

Add Loading classification to Manhole schedule

Add a column for manhole cover loading classification on manhole schedule. Required for S104 and construction plans
Guest 25 days ago in  0 👷🏽‍♀️Promoted

Embodied Carbon Calculation

Embedded carbon calculation per M of PIpe and surround and carbon report output
Guest 10 months ago in  1 👷🏽‍♀️Promoted

To be able to show pipe crossings when plotting long sections.

When plotting long sections, it would be useful to be able to show the crossings from other drainage networks. The crossing are shown on the long sections viewer in flow but not when you plot them.
Guest 7 months ago in  0 👷🏽‍♀️Promoted

Separating Flow Design Reports - Ability to split large flow networks into phased design reports.

There is a requirement to be able to produce design reports for separate sections of a larger Flow network when working on multi-phase developments.
Guest about 2 months ago in  0 👷🏽‍♀️Promoted

Minimum Pipe Length

The mimimum pipe length in Flow is currently set to 1m. Where modelling junctions and connections there may be less than 1m between the junctions. Please revise the minimum length to around 300-500mm.
Guest almost 2 years ago in  1 👷🏽‍♀️Promoted

Infiltration volume

Add a column called ‘Infiltration Volume’ to the simulation results table which indicates the total volume of water infiltrating into the ground at the upstream manhole during the selected storm.
Guest 6 months ago in  0 👷🏽‍♀️Promoted

Infiltration Half Drain time calculations

We have recently been challenged by Wiltshire LLFA regarding half drain times. As I understand it, Flow calculates the half drain time to CIRIA 156 which gives a significantly longer half drain time than the BRE365 method that Micro Drainage uses....
Guest 5 months ago in  1 👷🏽‍♀️Promoted

Time to half empty Calculations

I have a request regards time to half empty of infiltration systems. Irrespective of what I set in the preference page (whether time to half empty by volume or by storm) I just get time to half empty of the structure. That isn’t very useful inform...
Guest 9 months ago in  0 👷🏽‍♀️Promoted

Total Impermeable Area on Calcs Printout

The sum of the total impermeable area is not currently printed on the calcs, this could be incorporated with the total Time/Area information (as per a previous suggestion) as MicroDrainage does.
Guest almost 2 years ago in  0 👷🏽‍♀️Promoted