Skip to Main Content
Drainage Design Focus Group Ideas Portal
ADD A NEW IDEA

All ideas

Showing 99 of 99

Quick Storage Calculations For Soakaways Without The Use Of The Base

When looking at the preliminary quick storage calculations used for preliminary designs/drainage strategies, the quick storage tool is excellent up until the point you want to design soakaways as there is no option to get a quick storage calculati...
Guest about 1 year ago in  0 👷🏽‍♀️Promoted

General user interface improvements

Having used Flow now for the last 6 months we feel there are plenty of user interface improvements than can be made. Add the link references in the results? When a link is selected, can the corresponding link on the section be highlight with a col...
Guest over 1 year ago in  0 👷🏽‍♀️Promoted

Change Porosity display

In the new update when you add the porosity it displays that porosity but it is quite an eye sore and would be beneficial to be able to remove or tone it down a bit.
Guest 3 months ago in  0 📋Registered

Ability to hide junctions/RWPs/etc. from the model output manhole schedule. Same with links.

No description provided
Tom Fox about 2 years ago in  0 👷🏽‍♀️Promoted

Separating Flow Design Reports - Ability to split large flow networks into phased design reports.

There is a requirement to be able to produce design reports for separate sections of a larger Flow network when working on multi-phase developments.
Guest 7 months ago in  0 👷🏽‍♀️Promoted

sort tables

Either add facility to sort table entries numerically by node or link number - or amend software so that the tabulated data automatically displays in numerical order even after a model has been altered by adding or renumbering nodes. This would he...
Guest over 1 year ago in  0 👷🏽‍♀️Promoted

Dark mode

I understand that it might be a stretch, but it would be great if there was a possibility to switch to dark mode in Flow.
Guest over 1 year ago in  0 👷🏽‍♀️Promoted

Add a 'lock Node/Catchment positions' button to the Sketch window.

This is a very serious issue, if you accidently move an area, SmartTools will then double count that area next time you import it into Flow
Tom Fox about 2 years ago in  0 👷🏽‍♀️Promoted

Provide technical guidance an the use of ReFH2 in Flow

There is an absence of guidance on the use of ReFH2 data in Flow. I understand from discussions with the Help Desk that they don't have access to the software. In the absence of reasonable guidance the ReFH2 features are worthless.
Guest 4 months ago in  0 📋Registered

Chainage, pipe bedding and cover grade information in long section exports

Add chainage, pipe bedding and node cover grade information as options for long section outputs. These are standard requirements for a lot of water authorities so would prevent manual changes being required to allow these outputs to be included.
Guest 4 months ago in  0 📋Registered