Radial Infiltration Rate for Deep Bore Soakaway

The software asks for infiltration rate as m/hr which is based on BRE365 Infiltration testing in trial pits. Trial pits are not feasible for deep infiltration and as such the radial infiltration rate, the one we get from borehole testing, should b...
Guest almost 2 years ago in  0 👷🏽‍♀️Promoted

Specific Statement of Storage in tank or pond

I don't believe it is possible to simply display the storage amount in printed results (Design Report) as a separate entity. It does of course show up within the results list for the various storms, however, this is not very clear and of course is...
Guest 12 months ago in  0 👷🏽‍♀️Promoted

Optimisation tool for storage structures

A wizard for reducing down one or more storage structures to the optimum required size. Something like this: Select all storage features of interest. Enter key design criteria (e.g. max depth, porosity, design storm of interest etc.) Run an optimi...
Guest almost 2 years ago in  0 👷🏽‍♀️Promoted

Auto pipe sizing per number of dwellings contributing

We need to upsize wastewater pipes from 150mm dia. to 225mm dia. as soon as the total number of dwellings contributing to that pipe exceeds 20. Could this be added to the Auto-design parameters?
Guest about 2 years ago in  0 👷🏽‍♀️Promoted

Outfall Invert Level in the Centre of Storage.

We are trying to add storage off of a manhole, however don't want the IL as per the manhole or the base of storage. We have designed the soakaway 10m x 20m with a depth of 1m. We want the IL to be different to the manhole IL and have added the soa...
Guest about 1 year ago in  0 👷🏽‍♀️Promoted

Window size when moving Flow between multiple screens

Why does the window size of Flow decrease so much if it is moved from one screen to another when using multiple screens? Somewhat annoying to have to re-size it in the 2nd screen
Guest about 2 years ago in  0 👷🏽‍♀️Promoted

pre-development discharge rates/ volumes

When calculating the pre-development discharge rates you get the Qbar and the Qmed for the requested return periods. For discussions with utility providers would be useful to obtain it for storm durations like the 15minutes and 30 minutes storm.
Guest about 2 years ago in  0 👷🏽‍♀️Promoted

Slope in percentage

Just a preference option to dispaly slopes in percentage rather than in 1:X only in Flow.
Guest about 1 year ago in  0 👷🏽‍♀️Promoted

.pfd File Locking - 'Read Only' Status

There doesnt seem to be any 'locking' of PFD files when they're opened. Currently individuals, or multiple users, can open the same file and overright it. Clearly thats less than ideal! It also happens with SmartTools, if you export out of SmartTo...
Guest about 1 year ago in  0 👷🏽‍♀️Promoted

Export Flow Design to native .INP for use in other programmes

No description provided
Guest over 1 year ago in  0 👷🏽‍♀️Promoted