Skip to Main Content
Drainage Design Focus Group Ideas Portal
ADD A NEW IDEA

All ideas

Showing 91 of 91

sort tables

Either add facility to sort table entries numerically by node or link number - or amend software so that the tabulated data automatically displays in numerical order even after a model has been altered by adding or renumbering nodes. This would he...
Guest over 1 year ago in  0 👷🏽‍♀️Promoted

Ability to hide junctions/RWPs/etc. from the model output manhole schedule. Same with links.

No description provided
Tom Fox almost 2 years ago in  0 👷🏽‍♀️Promoted

Dark mode

I understand that it might be a stretch, but it would be great if there was a possibility to switch to dark mode in Flow.
Guest about 1 year ago in  0 👷🏽‍♀️Promoted

Produce Hydrograph data from a simulation for the length of the Simulation run

Would is be possible to produce Hydrograph data for a Node that included the critical data all the way up to the Modelled storm event for all critical events. Currently we seem to get data shown up to the critical event then only about half the ti...
Guest 3 months ago in  0 📋Registered

COBie information for drainage systems

Clients are requesting we provide COBie information for drainage systems - it would be useful to have the ability to embed COBie data into the drainage model and export it for others to use. This is likely to be a more suitable feature in Flow but...
Guest 7 months ago in  0 👷🏽‍♀️Promoted

Add a 'lock Node/Catchment positions' button to the Sketch window.

This is a very serious issue, if you accidently move an area, SmartTools will then double count that area next time you import it into Flow
Tom Fox almost 2 years ago in  0 👷🏽‍♀️Promoted

Import Multiple Networks into one PFD file

For example if you had two PFD files, one for the west side drainage network and one for the Eastern side drainage network (perhaps because two people were designing them). But once designed you wanted to combine into one PFD file. i believe you c...
Guest about 2 years ago in  2 👷🏽‍♀️Promoted

Actual discharge rates achieved in the approval report

Report the actual discharge rates achieved in the approval report, not just that they are below the GFR rates.
Tom Fox almost 2 years ago in  0 👷🏽‍♀️Promoted

Copy out Flow Control Reference

As it stands, you are unable to copy out the specific flow control reference. Which results in a laborious process to manually copy out for use in other programmes.
Guest about 1 year ago in  0 👷🏽‍♀️Promoted

Volume Summary Report

One page formal print out summarising the manhole, pipe and storage structure volumes within the SW network. This is often requested during planning stages of developments.
Guest over 1 year ago in  0 👷🏽‍♀️Promoted